Our students have been working hard on designing our robot. The Mechanical sub-team has cut two frames and sent them out to be fabricated. They then painted both frames and are now assembling the drive train. The pick-up and shooting sub-teams have been working on prototypes for the final bot.

The Programming sub-team has continued optimizing PIE control drive train.

Our students working with CAD are nearly finished with drawing our shooting system and our drive train and are starting to draw up designs for pick up.

We finished the Frisbee loader and climbing pyramid portions of the practice field.